| |
The bird call heard on this
page: Tui
Template
MANAGEMENT PLAN FOR WALKWAYS
PROJECT |
|
|
Name |
-
|
Type (Short Walk or Walking Track) |
-
|
Distance (and time) |
-
|
Location |
-
|
General |
-
|
STAGE ONE |
Underway |
Completed |
Feasibility and Scoping (Research & Planning) |
|
|
Discussion Document |
-
|
-
|
Determine preliminary
health & safety requirements |
- |
- |
On the ground survey including ownership and access |
-
|
-
|
Stakeholder consultation inc Iwi consultation |
-
|
-
|
Natural and Cultural Heritage features research, survey
& mapping |
-
|
-
|
Further consultation & updated document |
-
|
-
|
Evaluation and risk assessment |
-
|
-
|
|
|
|
STAGE TWO |
Underway |
Completed |
Engineered, Surveyed Plan with costings |
|
|
Project management and co-ordination |
-
|
-
|
Technical Survey |
-
|
-
|
Legal access arrangements |
-
|
-
|
QE II arrangements |
-
|
-
|
Iwi consultation |
-
|
-
|
Stakeholder consultation & communication |
-
|
-
|
NZ standard track design according to classification |
-
|
-
|
Design and costing of structures |
-
|
-
|
Determine health & safety requirements to this walk |
-
|
-
|
Building & resource consents as required |
-
|
-
|
Design visitor requirements and facilities |
-
|
-
|
Design and eco-sourcing of native plantings |
-
|
-
|
Research and design predator control |
-
|
-
|
Research and design weed control |
-
|
-
|
Landowner requirements |
-
|
-
|
Plan brochures, promotional material |
-
|
-
|
Design Signage |
-
|
-
|
Design Interpretation panels |
-
|
-
|
Evaluation |
-
|
-
|
|
|
|
STAGE THREE |
Underway |
Completed |
Implementation |
|
|
Project management and co-ordination |
-
|
-
|
Staged construction of walkway |
-
|
-
|
Manufacture and install bridges, culverts ,etc |
-
|
-
|
General signage + installation |
-
|
-
|
Interpretation panels + install |
-
|
-
|
Plantings in season over several years |
-
|
-
|
Construct + install visitor facilities |
-
|
-
|
Produce promotional literature |
-
|
-
|
Ongoing stakeholder consultation |
-
|
-
|
Predator control programme |
-
|
-
|
Weed control programme |
-
|
-
|
Maintenance programme |
-
|
-
|
Evaluation - visitor satisfaction, stakeholder expectation,
eco success, cultural outcomes |
-
|
-
|
Monitor walkway |
-
|
-
|
Monitor feedback loops |
-
|
-
|
Back to Top
|